Staffbull wrote:
What tests would be carried out apart from earth continuity, RCD
disconnection times, I take it a dielectric strength test would be one
at least.
Before energising:
Continuity of protective conductors (i.e. earths and bonds)
continuity of Ring circuits (in FAQ)
Insulation resistance
Polarity
(Earth electrode resistance in TT installations)
Then energise:
Polarity (again, to confirm)
earth fault Loop impedance (Zs)
prospective fault current and External loop (Ze)
functional testing, including RCD operation.
And in that order, giving the mnemonic CRIPPLER.
--