Subfloor repair
Getting good acess at the 1 pm and 8 pm positions may prove to be a
problem as the joist is in about 6 inches under the concrete block with
a gap of about 6 inches for access. What do you suggest a hanger?
As for the insulation, it is all in perfect condition. The water never
touched the outerwalls of the bathroom or otherwise.
|