View Single Post
  #5   Report Post  
Nick Finnigan
 
Posts: n/a
Default Routing waste pipe past shower tray

"Matt Beard" wrote in message
om...

Notches can be cut in the top of a joist in an area that stretches
from 7% of the span from one support to 25% of the span from the same
support. The notch must be no deeper than the lesser of 12.5% of the
depth of the joist or 250mm.


That just about rules out notches for waste pipes then.