External Pre Hung Doors
Hi
Thinking of replacing my front door and look at sizes available I'm going to be left with an inch and a quarter gap in the height. So, do I pack up the bottom and then mortar it, or let in rest on the bottom & fill the gap at the top? Dave |
In article .com,
Magician wrote: Thinking of replacing my front door and look at sizes available I'm going to be left with an inch and a quarter gap in the height. So, do I pack up the bottom and then mortar it, or let in rest on the bottom & fill the gap at the top? A nice hardwood threshold fixed and waterproofed to the step looks good - and will help stop blown water getting in. -- *60-year-old, one owner - needs parts, make offer Dave Plowman London SW To e-mail, change noise into sound. |
All times are GMT +1. The time now is 03:41 PM. |
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter