DIYbanter

DIYbanter (https://www.diybanter.com/)
-   UK diy (https://www.diybanter.com/uk-diy/)
-   -   Plaster second skim coat days later? (https://www.diybanter.com/uk-diy/625108-plaster-second-skim-coat-days-later.html)

George Miles November 16th 18 09:14 PM

Plaster second skim coat days later?
 
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george

Fredxx[_3_] November 16th 18 09:59 PM

Plaster second skim coat days later?
 
On 16/11/2018 21:14, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.


I've tended to do the one coat.

You should use the same amount of plaster overall whether one coat or
two. 2 x 1.5mm vs 1 x 3mm.

The first coat is more to cover and the second applied after it has gone
stiff but before it had hardened. The first need not be polished, unlike
the second coat.

Tim Watts[_5_] November 16th 18 10:48 PM

Plaster second skim coat days later?
 
On 16/11/18 21:14, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george


Not really - the way it works is to blend into the 1st coat IME

--
Email does not work

harry November 17th 18 06:56 AM

Plaster second skim coat days later?
 
On Friday, 16 November 2018 21:14:55 UTC, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george


IME it may not stick.
So,
Wet down first coat with diluted PVA
Mix in PVA with second coat

Jim K[_3_] November 17th 18 09:21 AM

Plaster second skim coat days later?
 
Fredxx Wrote in message:
On 16/11/2018 21:14, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.


I've tended to do the one coat.


(Snip)

Care to elaborate?

--
Jim K

Tricky Dicky[_4_] November 17th 18 10:32 AM

Plaster second skim coat days later?
 
I do not think the top skim of plaster will not stick, after all it adheres to many surfaces such as old plaster and even paint when you feather it in to existing plaster. The problem I think you will find is that it will be difficult to smooth out as the drier plaster will tend to suck the water out of the coat you are applying. Wetting may help although the amount you will have to apply might affect the integrity of the first coat. A PVA seal may be your best option if you cannot apply two coats at the same time.

Richard

Fredxx[_3_] November 17th 18 11:38 AM

Plaster second skim coat days later?
 
On 17/11/2018 09:17, Jim K wrote:
Fredxx Wrote in message:
On 16/11/2018 21:14, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.


I've tended to do the one coat.


(Snip)

Care to elaborate?


I have put on one coat of finishing plaster and then gone over to where
I started and polished it, going over the area a number of times.

We are talking putting a skim on plasterboard if there is any confusion.


Fredxx[_3_] November 17th 18 11:41 AM

Plaster second skim coat days later?
 
On 17/11/2018 06:56, harry wrote:
On Friday, 16 November 2018 21:14:55 UTC, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george


IME it may not stick.
So,
Wet down first coat with diluted PVA


A plasterer I know, where putting a skim onto old plaster, would paint
PVA onto the old and coat when still tacky.

Mix in PVA with second coat


Not hear of that.


alan_m November 17th 18 04:29 PM

Plaster second skim coat days later?
 
On 17/11/2018 06:56, harry wrote:
On Friday, 16 November 2018 21:14:55 UTC, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george


IME it may not stick.
So,
Wet down first coat with diluted PVA
Mix in PVA with second coat


When I've had to do this I've always left the first coat with a
thoroughly keyed surface by scoring the surface after it has started to
go hard. Before the second coat paint with PVA, leave for a short while
for it to start getting to the really sticky state, and then applying a
second coat of plaster. If the PVA has dried out before you get to start
plastering apply another coat.
--
mailto : news {at} admac {dot} myzen {dot} co {dot} uk

George Miles November 17th 18 09:03 PM

Plaster second skim coat days later?
 
With a friend we did 2 plaster coats in 9 hours,
the ceiling about 5 meters by 5 meters
(8 sawn off plasterboards)
3 and a half bags of multifinish,
5 mixes.

I'm a bit too tired to try and dampen it and polish it tonight,
I would probably do more damage than good,
so will sand and fill it in a few days.

Thanks for the advice and encouragement,
I now know how much plastering I can do in a day,
roughly 2 hours per 4x8 plasterboard,
a bit longer with final polishing
(which would save time from sanding and patching!)

On Friday, November 16, 2018 at 9:14:55 PM UTC, George Miles wrote:
Most youtube videos show plaster being applied in 2 coats,
with a second skim coat when its half dry.

Can the second skim coat be applied a few days later ?

I've a big ceiling to do tomorrow and might get tired and clumsy after lifting up the first coat.

george




All times are GMT +1. The time now is 04:40 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter