Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#9
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]() "Andrew Gabriel" wrote in message ... I've done this with 10mm copper, and it seems to be working well. I know someone who did something similar. He used 8mm copper coiled pipe. He clipped it to the side of the joists, about 1/4 way down, all along the length of each joist in one continuous loop. He use two loops to even out the heat - hottest in the centre of the room. The pipe did not touch the joists, running though joists through 3/4" holes. The control was a simple room stat and zone valve. The boiler was set to 65-70C. He did not lay the floor covering until one month after in case of floor shrinkage. It works OKish. The on-off control does not make matters better with temperature overshoots. The floor is warmish, but lots of insulation beneath the pipes in the floorspace. His boiler is old and he plans to fit a condensing boiler I suggested a Broag dual temperature boiler using a 3-way valve DHW priority system, This, runs the boiler temp to maximum when heating DHW. He plans to put UFH in a similar way under all his suspended ground floor. I told him to put larger rads upstairs and run the lot on the weather compensator, with 55c max temp on the compensator slope. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Water Heater Flushing: Good idea or bad idea? | Home Repair | |||
Any idea what this is and what it's for ? | UK diy | |||
Brilliant Idea or Dumb Idea | Woodturning | |||
A win-win idea | UK diy |