Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to uk.d-i-y
|
|||
|
|||
how soon can I use self levelling on new floor screed
my first attempt at laying a floor screed on top of the concrete
oversite yesterday, in total 40 x 25kg bags of sharp sand mixed and laid on my own- I'm knackered! the depth I had to make up due to previous builder 'mis-calculating' was 135mm. I laid some spare 50mm kingspan then 85mm of screed on top. as I was doing it on my own, and my 1st time I didn't managed to get a really flat surface although the floor is generally level, and even though I'm going to be putting quarry tiles on it, I'd like to level the floor up first. so, question, how soon can I lay some floor levelling on it? the type of stuff B&Q sell cheers |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Levelling a floor | UK diy | |||
reccomend a self levelling screed for concrete floor | UK diy | |||
PVA new screed floor? | UK diy | |||
Self levelling screed | UK diy |