UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 568
Default And now for the plumbing !!!

Hello all, I would appreciate some help on how to route the microbore
for the two new rads in the extension. the pipes need to go through the
joists, so is it a case of drilling or notching?
Notching would be the easiest way to run the pipe but I want to do it
correctly.

Also could you please confirm from what i have read in the building
regs regards drilling holes in joists. holes to be drilled in a zone
from .25 - .40 X lenght of joist and holes to be spaced 3X diameter of
hole apart. and no more than 1/6 diameter of width of joist.

many thanks once again.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +1. The time now is 06:38 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"