ted August 7th 15 08:52 PM

dry time for concrete footing
 
We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings

I was wondering the dry time would be approximately before we can put load bearing posts on the footing

This is for opening a load bearing wall to the kitchen

any ideas as to when the footings should have aout 3000psi strength?

Oren[_2_] August 7th 15 08:58 PM

dry time for concrete footing
 
On Fri, 7 Aug 2015 12:52:42 -0700 (PDT), ted
wrote:

We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings

I was wondering the dry time would be approximately before we can put load bearing posts on the footing

This is for opening a load bearing wall to the kitchen

any ideas as to when the footings should have aout 3000psi strength?


I have no clue as to the time for a load bearing wall. Here in the
desert, a footer is given a week or ten days before a 6' CBS (block)
wall is being built. Those footers a tad smaller.

Bert August 7th 15 09:08 PM

dry time for concrete footing
 
On 8/7/2015 3:52 PM, ted wrote:
We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings

I was wondering the dry time would be approximately before we can put load bearing posts on the footing

This is for opening a load bearing wall to the kitchen

any ideas as to when the footings should have aout 3000psi strength?


Depends on what grade of concrete you used but a good rule of thumb is to keep it wet for 7 days before loading.



Ed Pawlowski August 8th 15 03:55 AM

dry time for concrete footing
 
On 8/7/2015 3:52 PM, ted wrote:
We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings

I was wondering the dry time would be approximately before we can put load bearing posts on the footing

This is for opening a load bearing wall to the kitchen

any ideas as to when the footings should have aout 3000psi strength?


Minimum is usually 7 days to get most of its strength, 28 days is
considered fully cured even though it will cure for much longer. Keep
it wet.

micky August 8th 15 07:10 AM

dry time for concrete footing
 
In alt.home.repair, on Fri, 7 Aug 2015 22:55:39 -0400, Ed Pawlowski
wrote:

On 8/7/2015 3:52 PM, ted wrote:
We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings

I was wondering the dry time would be approximately before we can put load bearing posts on the footing

This is for opening a load bearing wall to the kitchen

any ideas as to when the footings should have aout 3000psi strength?


Minimum is usually 7 days to get most of its strength, 28 days is
considered fully cured even though it will cure for much longer. Keep
it wet.


In 1970 when I was at the Panama Canal, which was built before 1910,
they told me the locks were still curing and still getting harder, but
they was already hard enough that when ships hit it, the ship got
dented. They were kept wet up to the water level.

bob haller August 8th 15 01:01 PM

dry time for concrete footing
 
best to ask the local building inspector. ultimately he must sign off on your project

Oren[_2_] August 8th 15 05:38 PM

dry time for concrete footing
 
On Sat, 08 Aug 2015 02:10:37 -0400, micky
wrote:

In 1970 when I was at the Panama Canal, which was built before 1910,
they told me the locks were still curing and still getting harder, but
they was already hard enough that when ships hit it, the ship got
dented. They were kept wet up to the water level.


Seems I recall it would have taken ~700 years for the (Boulder) Hoover
Dam to cure. They used pipes to circulate water through that reduced
the curing time.

Tekkie® August 14th 15 08:37 PM

dry time for concrete footing
 
ted posted for all of us...

Answers in-line

We are pouring 3 ft concrete footings 2 feet deep so 3'x3'x2'deep footings


Why so wide and not very deep? Did you get a plan for this? Any rebar? 18 cu
feet will = .67 cu yd. Means hand mixing. Ready mix trucks usually have a
minimum so you have any more to pour?

I was wondering the dry time would be approximately before we can put load bearing posts on the footing


7 days and make sure to cure it properly.

This is for opening a load bearing wall to the kitchen


Ok, you got permits?

any ideas as to when the footings should have aout 3000psi strength?


28 days

--
Tekkie *Please post a follow-up*

bob haller August 15th 15 01:58 PM

dry time for concrete footing
 
On Saturday, August 8, 2015 at 12:38:24 PM UTC-4, Oren wrote:
On Sat, 08 Aug 2015 02:10:37 -0400, micky
wrote:

In 1970 when I was at the Panama Canal, which was built before 1910,
they told me the locks were still curing and still getting harder, but
they was already hard enough that when ships hit it, the ship got
dented. They were kept wet up to the water level.


Seems I recall it would have taken ~700 years for the (Boulder) Hoover
Dam to cure. They used pipes to circulate water through that reduced
the curing time.


the pipeses carried water to cool the dam so the concrete would be stronger

Oren[_2_] August 15th 15 05:21 PM

dry time for concrete footing
 
On Sat, 15 Aug 2015 05:58:10 -0700 (PDT), bob haller
wrote:

On Saturday, August 8, 2015 at 12:38:24 PM UTC-4, Oren wrote:
On Sat, 08 Aug 2015 02:10:37 -0400, micky
wrote:

In 1970 when I was at the Panama Canal, which was built before 1910,
they told me the locks were still curing and still getting harder, but
they was already hard enough that when ships hit it, the ship got
dented. They were kept wet up to the water level.


Seems I recall it would have taken ~700 years for the (Boulder) Hoover
Dam to cure. They used pipes to circulate water through that reduced
the curing time.


the pipeses carried water to cool the dam so the concrete would be stronger


reduced curing time = stronger Get it?

The dam was stronger faster, do you think the dam is fully cured, eh?

bob haller August 15th 15 09:07 PM

dry time for concrete footing
 
On Saturday, August 15, 2015 at 12:22:10 PM UTC-4, Oren wrote:
On Sat, 15 Aug 2015 05:58:10 -0700 (PDT), bob haller
wrote:

On Saturday, August 8, 2015 at 12:38:24 PM UTC-4, Oren wrote:
On Sat, 08 Aug 2015 02:10:37 -0400, micky
wrote:

In 1970 when I was at the Panama Canal, which was built before 1910,
they told me the locks were still curing and still getting harder, but
they was already hard enough that when ships hit it, the ship got
dented. They were kept wet up to the water level.

Seems I recall it would have taken ~700 years for the (Boulder) Hoover
Dam to cure. They used pipes to circulate water through that reduced
the curing time.


the pipeses carried water to cool the dam so the concrete would be stronger


reduced curing time = stronger Get it?

The dam was stronger faster, do you think the dam is fully cured, eh?


actually no, slower cooling time greater strength. the hoover dam is still not fully cured

the temperature of the dam if not cooled, would of been of very low strength