Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
Need advice on a sandbox
Hi,
Here's my work in progress: http://freeboundaries.com/sandbox.jpg I have PT 4x4 in the ground (the kind that's safe to have, and it's been out in the rain for the past two months). They are kind of "single finger joined" as you can see in the bottom right. There are 5 screws in each joint. Then I have 2x12 rails, joined the way you can kind of see (the front of the four rails is not yet installed). The joint is reinforces by 2x2x12 blocks glued in and screwed. Two questions: 1. Should I drive rebars through the PT wood to make sure the base doesn't move? (The square shape is held together by 25 screws so I feel comfortable that it will stay together. But it might move although it is filled with 2+tons of sand. I guess I'm not sure why I would care if it moves a little.) 2. Should I caulk to gap b/w the 4x4 and the 2x12s? If so, what type of caulk should I use? Also, I haven't yet figured out how to fasten the 2x12's to the 4x4s. Many thanks in advance, Aaron |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
SEA-N-SANDBOX - PDF | Woodworking | |||
DELUXE SANDBOX | Woodworking | |||
SANDBOX | Woodworking | |||
Sandbox bottom? | Woodworking | |||
roof for sandbox | Home Repair |