Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
Install sequence - Interior doors & laminate floor
I'll get whole flooring and all interior doors replaced for the main level
of my house. Laminate to replace carpet, do it myself. For doors, get a carpenter to install pre-hungs. Doors include 4-fold doors for a couple of closets. I think the best sequence is: 1) remove existing doors/frames. 2) lay laminate flooring 3) install doors on new flooring. Advise please. Thanks. John |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Interior Doors | UK diy | |||
Recommend a floor paint - grotty timber interior floor & stairs. | UK diy | |||
Leveling floor for laminate install | Woodworking | |||
Leveling floor for laminate install | Home Repair | |||
Leveling floor for laminate install | Home Ownership |