![]() |
Confirming simple wiring task
Redid a small wiring chore at a cabin last weekend, and have been thinking
about the way I did it, wondering if a real electrician would have done it differently (besides in 1/10 the time). Have a 14/2 running to a double box in a wall. Installed two single pole switches in the box as follows. Not sure if Line and Load are the correct terms when talking switches, but you get my drift: Black off hot line in was ponytailed to two jumpers, one each to Line on switches. Load off switches to black on 14/2 leading to two ceiling lights. Neutral off hot line in was tied to neutrals in the 14/2's leading to the lights. Ground off hot line in tied to grounds in the 14/2's leading to the lights. Is there an alternate way to treat the neutrals in this case? |
Confirming simple wiring task
"Mamba" wrote in message news:jpGdnaXojalUZWbanZ2dnUVZ_hCdnZ2d@integraonlin e... Redid a small wiring chore at a cabin last weekend, and have been thinking about the way I did it, wondering if a real electrician would have done it differently (besides in 1/10 the time). Have a 14/2 running to a double box in a wall. Installed two single pole switches in the box as follows. Not sure if Line and Load are the correct terms when talking switches, but you get my drift: Black off hot line in was ponytailed to two jumpers, one each to Line on switches. Load off switches to black on 14/2 leading to two ceiling lights. Neutral off hot line in was tied to neutrals in the 14/2's leading to the lights. Ground off hot line in tied to grounds in the 14/2's leading to the lights. Is there an alternate way to treat the neutrals in this case? You did it fine. The only other way would be to run a 14/3 from the switches to one light,and a 14/2 from the first light to the second. The neutrals are always tied together as you did |
Confirming simple wiring task
On 4/8/2008 3:59 PM Mamba spake thus:
Redid a small wiring chore at a cabin last weekend, and have been thinking about the way I did it, wondering if a real electrician would have done it differently (besides in 1/10 the time). Have a 14/2 running to a double box in a wall. Installed two single pole switches in the box as follows. Not sure if Line and Load are the correct terms when talking switches, but you get my drift: Black off hot line in was ponytailed to two jumpers, one each to Line on switches. Load off switches to black on 14/2 leading to two ceiling lights. Neutral off hot line in was tied to neutrals in the 14/2's leading to the lights. Ground off hot line in tied to grounds in the 14/2's leading to the lights. Is there an alternate way to treat the neutrals in this case? I second the emotion of the post above this one. You done good. By the way, your subject line is a complete misnomer: there ain't no such thing as a "simple wiring task". -- The best argument against democracy is a five-minute conversation with the average voter. - Attributed to Winston Churchill |
All times are GMT +1. The time now is 12:28 AM. |
Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter