Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
Looking at step 11:
http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? |
#2
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
Martik wrote:
Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? Personally I would be thrilled if I could do a good butt joint with only six passes. -- Joseph Meehan Dia duit |
#3
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
It all depends on the level of finish you desire. Even taper
joints show up on long walls due to lighting. Butt joints are much harder to disguise. If you really want to hide the butt joints, stagger the joints to the mid point between studs, place cardboard strips on the studs at each side of the joint, and use butt buddies or other scrap stud/wafer strip/ ply strip to fasten each side of the butt. This will recess the butt joints to a similar condition to taper joints. Regular quality butt joints can be done well with the tape coat and 1 or 2 finish coats. ______________________________ Keep the whole world singing . . . . DanG (remove the sevens) "Martik" wrote in message news:vmaAg.151980$I61.24892@clgrps13... Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? |
#4
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
Martik wrote:
Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? The 6 passes shown in the article are not separate coats of mud -- they're the passes he makes with the trowel to get the first coat of mud on the joint. You can finish just about any butt joint with three coats of mud. Not all butt joints are the same. You'll save yourself some time and mud (and have a better joint) if you take a few seconds to see what you've got before you start throwing mud at at. 1. Put the edge of the trowel or any 12" straight edge across the joint. See what kind of joint you have: A. The joint is peaked. (trowel will rock back and forth at the joint) B. The joint looks stepped. (trowel will lie flat on one side and there'll be a gap on the other --------________) C. Joint is recessed. (trowel doesn't touch the tape.) If (A) do basically what's described in the article. You don't want to leave a full 1/8" of mud over the tape, though. If you're having trouble (and you will) just aim for the point where you can just start to see the tape through the wet mud. Ideally you'd want to stop before you get to that point, but that's easier said than done. You'll have better luck getting the proper coverage on the second and third coats. If (B) you want to concentrate most of the mud (and the width of the joint) on the low side. There's no sense putting any more mud on the high side than is necessary to cover the tape. If {C} finish it as you would a factory tapered edge joint. Of course, the best way to finish a butt-joint is to not have a butt-joint in the first place whenever possible. You may also want to consider buttboard or similar products. http://www.trim-tex.com/catalog/staplegunsandtools.htm |
#5
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
Just your brain.
-- Jim McLaughlin Reply address is deliberately munged. If you really need to reply directly, try: jimdotmclaughlinatcomcastdotcom And you know it is a dotnet not a dotcom address. wrote in message ... On Wed, 02 Aug 2006 23:15:39 GMT, "Martik" wrote: Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? My butt dont have any joints. Am I missing some body parts? |
#6
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
On Wed, 02 Aug 2006 23:15:39 GMT, "Martik"
wrote: Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? Three passes to put mud on (rough). Three to feather a finish - step 11. (look at the strokes in the photo) It would take me more... Oren |
#7
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
"Mike Paulsen" wrote in message ... Martik wrote: Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? The 6 passes shown in the article are not separate coats of mud -- they're the passes he makes with the trowel to get the first coat of mud on the joint. You can finish just about any butt joint with three coats of mud. Not all butt joints are the same. You'll save yourself some time and mud (and have a better joint) if you take a few seconds to see what you've got before you start throwing mud at at. 1. Put the edge of the trowel or any 12" straight edge across the joint. See what kind of joint you have: A. The joint is peaked. (trowel will rock back and forth at the joint) B. The joint looks stepped. (trowel will lie flat on one side and there'll be a gap on the other --------________) C. Joint is recessed. (trowel doesn't touch the tape.) If (A) do basically what's described in the article. You don't want to leave a full 1/8" of mud over the tape, though. If you're having trouble (and you will) just aim for the point where you can just start to see the tape through the wet mud. Ideally you'd want to stop before you get to that point, but that's easier said than done. You'll have better luck getting the proper coverage on the second and third coats. If (B) you want to concentrate most of the mud (and the width of the joint) on the low side. There's no sense putting any more mud on the high side than is necessary to cover the tape. If {C} finish it as you would a factory tapered edge joint. Of course, the best way to finish a butt-joint is to not have a butt-joint in the first place whenever possible. You may also want to consider buttboard or similar products. http://www.trim-tex.com/catalog/staplegunsandtools.htm Thanks all for very helpful replies. I never knew such a product as buttboard existed. Too late for boards already up, maybe I'll try removing the paper cover like the tool "EZ-Backer Drywall Splicer". |
#8
Posted to alt.home.repair
|
|||
|
|||
Mudding butt joints
"Martik" wrote in message news:X_rAg.181654$771.133666@edtnps89... "Mike Paulsen" wrote in message ... Martik wrote: Looking at step 11: http://www.rd.com/content/openConten...78&pageIndex=1 Are 6 passes really required or are there alternate methods of "concealing" this type of joint? http://www.ezbacker.com/rock_splicer.html |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
miter joints + easy to disassemble | Woodworking | |||
45deg finger joints | Woodworking | |||
How to fix old chair with worn mortise and tenon joints? | Woodworking | |||
Please help recommend joints for dresser/armoire plans! | Woodworking | |||
Paving Stone Joints | UK diy |