Default How to handle the roofing ridge between doing each side during a long spanned project

I am doing a roofing job on my home over the course of a summer or well
maybe a year if winter comes early here in Wisconsin. The shingles
along the top I call the ridge shingles. I can cut three from a
three-tab shingle or buy them ready-made. What would you suggest for
that area if I can't get to the roof right away on the other side or
the ridge? Also with all the different sections some share that ridge
so its like all or nothing needs to be done within days, I know I do
not have that much consecutive time and with weather this is going to
be a weekend project. Other than tarping that unfinished ridge. My
question is if I make or buy pre made ridge shingles might I be ok to
nail the undone side down and then pry it up to shingle up under it
when I finally get to that side? Or should I buy mineral sheet roofing
and cut and use that temporarily as my ridge protection and try to
reuse it if it will come up ok on those parts of the roof till the
whole job is completed? My thinking is each time I pull the temporary
ridge rolled sheet roofing is that I can cut the area that I nailed at
the end if it tares or does not come up clean and just shorten it each
time I reuse it. I know this rolled roofing would give me a much longer
run between nails on the ridge do you think rain or wind might be a
factor in that length no seal tabbed lineal run along the roof. I hate
to buy or cut ridge shingles as temps only to have to pull them and
trash them if they do not come up clean between the total completion of
both sides of the roof between the ridge.

  #2   Report Post  
Posted to alt.home.repair
Robert Allison
 
Posts: n/a
Default How to handle the roofing ridge between doing each side duringa long spanned project

DJW wrote:
I am doing a roofing job on my home over the course of a summer or well
maybe a year if winter comes early here in Wisconsin. The shingles
along the top I call the ridge shingles. I can cut three from a
three-tab shingle or buy them ready-made. What would you suggest for
that area if I can't get to the roof right away on the other side or
the ridge? Also with all the different sections some share that ridge
so its like all or nothing needs to be done within days, I know I do
not have that much consecutive time and with weather this is going to
be a weekend project. Other than tarping that unfinished ridge. My
question is if I make or buy pre made ridge shingles might I be ok to
nail the undone side down and then pry it up to shingle up under it
when I finally get to that side? Or should I buy mineral sheet roofing
and cut and use that temporarily as my ridge protection and try to
reuse it if it will come up ok on those parts of the roof till the
whole job is completed? My thinking is each time I pull the temporary
ridge rolled sheet roofing is that I can cut the area that I nailed at
the end if it tares or does not come up clean and just shorten it each
time I reuse it. I know this rolled roofing would give me a much longer
run between nails on the ridge do you think rain or wind might be a
factor in that length no seal tabbed lineal run along the roof. I hate
to buy or cut ridge shingles as temps only to have to pull them and
trash them if they do not come up clean between the total completion of
both sides of the roof between the ridge.


When you get to the ridge on whatever side you are working on,
the last row of shingles should go up and over the ridge.
This will give you most of the weatherproofing that you need.
In most cases, the ridge cap (the proper term for the ridge
shingles as you call them) is more decorative than functional.
The shingles themselves should do the weatherproofing and
the cap is just additional insurance.

When we have to do what you are doing, we run the side we are
working on up and over the ridge. We pull the last top row of
shingles off the other side and then lay felt over the ridge
before putting on the last (top row) of shingles on the side
you are working on. When you fold them over the ridge and
nail them down, you are effectively waterproofed and you don't
have to worry about placeing cap and taking it back up.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX
  #3   Report Post  
Posted to alt.home.repair
RicodJour
 
Posts: n/a
Default How to handle the roofing ridge between doing each side during a long spanned project


DJW wrote:
I am doing a roofing job on my home over the course of a summer or well
maybe a year if winter comes early here in Wisconsin. The shingles
along the top I call the ridge shingles. I can cut three from a
three-tab shingle or buy them ready-made. What would you suggest for
that area if I can't get to the roof right away on the other side or
the ridge? Also with all the different sections some share that ridge
so its like all or nothing needs to be done within days, I know I do
not have that much consecutive time and with weather this is going to
be a weekend project. Other than tarping that unfinished ridge. My
question is if I make or buy pre made ridge shingles might I be ok to
nail the undone side down and then pry it up to shingle up under it
when I finally get to that side? Or should I buy mineral sheet roofing
and cut and use that temporarily as my ridge protection and try to
reuse it if it will come up ok on those parts of the roof till the
whole job is completed? My thinking is each time I pull the temporary
ridge rolled sheet roofing is that I can cut the area that I nailed at
the end if it tares or does not come up clean and just shorten it each
time I reuse it. I know this rolled roofing would give me a much longer
run between nails on the ridge do you think rain or wind might be a
factor in that length no seal tabbed lineal run along the roof. I hate
to buy or cut ridge shingles as temps only to have to pull them and
trash them if they do not come up clean between the total completion of
both sides of the roof between the ridge.


If you're using Ice & Water Shield at the eaves, use a 12" strip of it
wrapped over the ridge and nailed/stapled in place.

R

  #4   Report Post  
Posted to alt.home.repair
DJW
 
Posts: n/a
Default How to handle the roofing ridge between doing each side during a long spanned project

Do you mean a metal strip?
RicodJour wrote:
DJW wrote:
I am doing a roofing job on my home over the course of a summer or well
maybe a year if winter comes early here in Wisconsin. The shingles
along the top I call the ridge shingles. I can cut three from a
three-tab shingle or buy them ready-made. What would you suggest for
that area if I can't get to the roof right away on the other side or
the ridge? Also with all the different sections some share that ridge
so its like all or nothing needs to be done within days, I know I do
not have that much consecutive time and with weather this is going to
be a weekend project. Other than tarping that unfinished ridge. My
question is if I make or buy pre made ridge shingles might I be ok to
nail the undone side down and then pry it up to shingle up under it
when I finally get to that side? Or should I buy mineral sheet roofing
and cut and use that temporarily as my ridge protection and try to
reuse it if it will come up ok on those parts of the roof till the
whole job is completed? My thinking is each time I pull the temporary
ridge rolled sheet roofing is that I can cut the area that I nailed at
the end if it tares or does not come up clean and just shorten it each
time I reuse it. I know this rolled roofing would give me a much longer
run between nails on the ridge do you think rain or wind might be a
factor in that length no seal tabbed lineal run along the roof. I hate
to buy or cut ridge shingles as temps only to have to pull them and
trash them if they do not come up clean between the total completion of
both sides of the roof between the ridge.


If you're using Ice & Water Shield at the eaves, use a 12" strip of it
wrapped over the ridge and nailed/stapled in place.

R


  #5   Report Post  
Posted to alt.home.repair
DJW
 
Posts: n/a
Default How to handle the roofing ridge between doing each side during a long spanned project

then do you just hit the exsposecd nail on the side that is not done
yet with some roof cement? your suggestion sounds good but do i have to
remove the floded over shingles or am i wrong and felt will be what is
outer most over the ridge point and will that keep for maybe over a
winter? Thanks for the help.
Robert Allison wrote:
DJW wrote:
I am doing a roofing job on my home over the course of a summer or well
maybe a year if winter comes early here in Wisconsin. The shingles
along the top I call the ridge shingles. I can cut three from a
three-tab shingle or buy them ready-made. What would you suggest for
that area if I can't get to the roof right away on the other side or
the ridge? Also with all the different sections some share that ridge
so its like all or nothing needs to be done within days, I know I do
not have that much consecutive time and with weather this is going to
be a weekend project. Other than tarping that unfinished ridge. My
question is if I make or buy pre made ridge shingles might I be ok to
nail the undone side down and then pry it up to shingle up under it
when I finally get to that side? Or should I buy mineral sheet roofing
and cut and use that temporarily as my ridge protection and try to
reuse it if it will come up ok on those parts of the roof till the
whole job is completed? My thinking is each time I pull the temporary
ridge rolled sheet roofing is that I can cut the area that I nailed at
the end if it tares or does not come up clean and just shorten it each
time I reuse it. I know this rolled roofing would give me a much longer
run between nails on the ridge do you think rain or wind might be a
factor in that length no seal tabbed lineal run along the roof. I hate
to buy or cut ridge shingles as temps only to have to pull them and
trash them if they do not come up clean between the total completion of
both sides of the roof between the ridge.


When you get to the ridge on whatever side you are working on,
the last row of shingles should go up and over the ridge.
This will give you most of the weatherproofing that you need.
In most cases, the ridge cap (the proper term for the ridge
shingles as you call them) is more decorative than functional.
The shingles themselves should do the weatherproofing and
the cap is just additional insurance.

When we have to do what you are doing, we run the side we are
working on up and over the ridge. We pull the last top row of
shingles off the other side and then lay felt over the ridge
before putting on the last (top row) of shingles on the side
you are working on. When you fold them over the ridge and
nail them down, you are effectively waterproofed and you don't
have to worry about placeing cap and taking it back up.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Dewalt DW988 side handle replacement [email protected] Woodworking 0 June 20th 05 04:57 AM
Wayne Dalton Torquemaster and iDrive self-Install (Long) Scott Home Repair 3 March 2nd 05 03:34 AM
which side, again? brocpuffs Woodworking 12 February 10th 04 06:47 AM
finishing ridge on traditional garage slate roof (except for manfactured trusses) Paul UK diy 0 January 13th 04 11:16 PM


All times are GMT +1. The time now is 08:08 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"