Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
Fast setting concrete
I just hired a contractor to drill fence post holes and intstall fence
posts.He used a product called Sakrete to cement the poles in. He just poured the dry mix into the hole and sprayed water with the garden hose.He did this yesterday and today--a little less than 24 hours later not all of the posts are solid.I read the instructions on one of the bags and it says to premix the mixture first and then pour the wet concrete into the hole.Now I have seen on television that there is a product that you can pour dry into the hole and add water--but I am worried that this product is different. Should I be worried? |
#2
Posted to alt.home.repair
|
|||
|
|||
Fast setting concrete
|
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Help Refinishing/Resurfacing Concrete | Home Repair | |||
Concrete shed base | UK diy | |||
Acid vs. concrete. | Home Repair | |||
Help with concrete! | Home Repair | |||
Concrete Fence Posts - setting out | UK diy |