"Art M" wrote in message
news:qlb_e.20812$nq.9034@lakeread05...
Just wondering if there is any reason to use 1" pipe when replacing my
service line. I'm thinking there isn't since 3/4" pipe is running through
the slab to the main shut off valve, and I won't be replacing that.

--Art



Heh, all these stories about how 3/4" isn't enough. I have 5/8" coming in
which was reduced to 1/2" shortly after the meter.

My water pressure is fine.... as long as only one fixture is open at a time.

I planned on replacing most of the plumbing and only using 1/2" to feed off
of the main, which was going to be kept at 3/4" throughout. I wonder if I
should just think about having my main changed to 1". Then they could change
my crumby 3" main sewer line while they're at it. I can't believe turds can
flow through there. :-D