View Single Post
  #13   Report Post  
Amun
 
Posts: n/a
Default


"TimR" wrote in message
news:RlGYe.262632$E95.254294@fed1read01...
I need to temporarily run a length of romex 6/2 with ground ( rated for
inside use) across my flat roof.. I expect it'll be up there maybe two or
three weeks. Is it o.k. as is...or should I run it in electrical pvc
conduit to keep the sun off it while it is in temporary use ? (live in
Phoenix...still about 98-103 during the days)

Thanks, Tim



Well, it not "OKAY"

But I won't tell anyone.

Just wondering why you need such a heavy cable for only a "temporary" feed.
?
Obviously this is for more than just using a skill saw, while you build a
shed.