View Single Post
  #7   Report Post  
James \Cubby\ Culbertson
 
Posts: n/a
Default


"SQLit" wrote in message
...
NM cable is not rated to be inside a conduit system. I ran my pool pump
with
12-2 NM for a month while I got the new conduit run. As long as the 6 is
enough for the load and distance.



I'm just curious, and not meaning to start a flame war here, but where in
the code does it prohibit romex to be in conduit. I remember threads in
the past where this was discussed and I can't remember what the outcome was.
Cheers,
cc