Christian McArdle wrote:
It should read, "you will need to replace the hot water storage cylinder
with a part L1 compliant one (or better) to comply with the building regs"
No it shouldn't. There is no requirement to replace the hot water cylinder
with a compliant one when changing the boiler.
In which case I stand corrected!
(Not sure where I read that you needed to bring the cylinder up to spec
on a boiler change then)
--
Cheers,
John.
/================================================== ===============\
| Internode Ltd -
http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/