View Single Post
  #22   Report Post  
Steve Spence
 
Posts: n/a
Default

maybe in your community, but not in mine. I wired my whole house, panels
and entrance. The power company only dropped to the meter on the pole.
that was the end of it. I did the rest.

Steve Spence
Dir., Green Trust, http://www.green-trust.org
Contributing Editor, http://www.off-grid.net
http://www.rebelwolf.com/essn.html

ATP* wrote:


I've seen plenty of simpler electrical jobs screwed up or just poorly
executed by people with more than a bit of sense. In any case, it has to be
listed and inspected per the local utility regulations.


ATP* wrote:


Not a DIY job. Get a UL listed transfer switch, have a licensed
electrician install it and get it inspected.