On Sun, 28 Aug 2005 19:32:14 +0100, "Dave Matthews"
wrote:

Well that was the odd thing - there is a set of electrical cables that
run close to and parallel to the pipes but they have been fed through holes
cut through the centres of all the joists. The new cable I was putting in
required us to drill a new series of holes through the joists but it was a
doddle to do - about five minutes to drill five holes!

I'm guessing that the gas and water pipes were installed first by one
contractor and then another contractor was brought in to do the electrics
who decided to do his part of the job properly!


It is (or certainly was) specified that way in the wiring regs.

DG