View Single Post
  #7   Report Post  
chester
 
Posts: n/a
Default

Yeah thats right. I stopped the hardibacker 1" or so above the edge of
the tub flange, and then the tile goes down to ~1/8" from tub edge, and
calk.



wrote:
Guys, thanks for the responses. I did find this very good explaination
on John Bridge's site.

http://johnbridge.com/vbulletin/show...hower+flang e