View Single Post
  #5   Report Post  
Lew Hodgett
 
Posts: n/a
Default

An update.

I previously wrote:

Subject

A 4" layer of concrete is considered little more than a dust cover.

If you want to do it to last, think at least 6" with mesh.



Don't be surprised if jack hammering out the existing crowned pad and
pouring a whole new, mesh reinforced pad doesn't turn out to be the
least expense way to do the job.

Lew