View Single Post
  #5   Report Post  
Grunff
 
Posts: n/a
Default

Timothy Smith wrote:

Assuming that all the tiles are still level and havent sunk, there isnt
likely to be any other problems been caused by walking on it before it is
fully set are there ? I assume that its best to leave longer then before
putting general traffic but the odd footstep or so shouldnt cause any long
term problems.

Is this correct ?



I think it'll depend on how firm it had set :-)

There's no point worrying about it at this stage - you're either going
to have to redo it, or it'll be fine. You can choose to redo it now, or
to wait and see what it's like in a few days. I'd pick the latter.

--
Grunff