View Single Post
  #2   Report Post  
 
Posts: n/a
Default

Get a string line level and establish the grade. Then use a wheel
barrow, shovel, and rake. Depending on how much you are changing the
grade, you may need to remove and replant existing shrubs, etc. The
only real problems in all this is if what's there already is in the
way, ie land 10 ft away is too high already, sidewalk, etc.