View Single Post
  #10   Report Post  
Andy Hall
 
Posts: n/a
Default increase hot water pressure

On Mon, 24 May 2004 15:53:55 GMT, "BigWallop"
wrote:





The letter I need to write is about equipment that is going to be installed
alongside other electrical stuff that will cause interference on it, so I want
him to consider a change in the materials he wants used for the installation. I
know that the change will greatly increase the life span of the new equipment,
so I would like him to understand the benefits of changing it now before it's to
late.


Ah, I see.

I wonder with architects how much skin they have in the game after the
project is complete though. Do they design for form or function?

Let's hope he doesn't do airport roofs......



..andy

To email, substitute .nospam with .gl