View Single Post
  #13   Report Post  
Travis Jordan
 
Posts: n/a
Default

Bill Green wrote:
$16,000 included new two stage furnace with variable speed blower, 18
SEER AC condensor and compressor, two zoning systems with controls and
thermostats, electronic air cleaner, and all new galvanized metal
ducts.


Two systems, right?