"Robert11" wrote in message
When horizontal clapboards are installed, are they nailed (only) to the
studs ?
That is the best holding power.
Or, to the studs, and between also ?
Not needed
How do they know where the studs are if they are covered by the clapboards
immediately prior to the nailing ?
You mark the studs on the sheathing before the clapboard is started. Use a
level and a pencil or a chalk line.
|