Bob Minchin wrote:
The job(s) include digging holes to bury rubble, landscaping/ small root
extraction/levelling and trenching for light opubuilding footings. The plot
is small 30 x 40 feet so a small digger is essential. I can't do much by
hand due to a dodgy back.
If you can get one, I found the 1.5T diggers to be far more useful than
the 750kg ones. The smaller ones have an advantage if you need to get it
inside a house because they go through standard door widths, but the
amount fo work they can do compared to the 1.5T one (about 1m wide) is
tiny.
--
Cheers,
John.
/================================================== ===============\