Travis, thanks for the great link and Colbyt for the advice. The ramp I am
building is going to be about 2 feet in length, about 4 feet wide, and 4
feet deep at its deepest point (right near the shed). Colbyt, do you still
think I would still need to double up on the mastic, or need it at all with
a ramp this size? Thanks again.
"Travis Jordan" wrote in message
...
Eric and Megan Swope wrote:
How do I do this and what additional materials do I need to create
this mastic expansion joint?
http://www.pavingexpert.com/concjnt1.htm