Thread: Economy 7
View Single Post
  #4   Report Post  
fred
 
Posts: n/a
Default

In article , Mark Carver
writes
On the day sure enough the local electricity board turned up and changed
over the meter in about 10 minutes.

It took 5 weeks for the new meter data to reach Powergen however !

(I took photographs of the old meter, the man changing the meter, and
the new meter should it all have gone horribly wrong !)


Oh god yes, forgot that bit, take your own meter readings at the change
and send them to the supplier (without them asking), 5wks is the short end
of what I have seen for post change meter readings to reach them.
--
fred