Still, be careful in case the dust contains remnants of the asbestos.

With all that dust, sounds like at least, you don't have moisture problems.

Sounds like a good cleaning followed by painting with a concrete sealer.
Much of the dust that troubles you now may be just recirculating around the
room. After vacuuming every surface, go through with a leaf blower to
dislodge any more dust and vacuum everything again.

A paint or epoxy concrete sealer will do better than a water sealer which
wont stop new dust from grinding off the surface of the cement. For the
ceiling, if it is not flaking off in big pieces, a good paint job should
prevent any plaster dust from forming. You can treat the walls the same as
the floor with a concrete sealer like seal lock or similar. You should seal
them anyway even if you plan to frame a wall in front.

If the concrete floor is uneven, rough, badly cracked or just unattractive,
you might be able to pour a thin coat of self leveling (concrete) mix over
the whole thing and make a new surface. Leveling now may save you a step
later if you decide to tile or put in just about any flooring surface. You
can prep the old floor with a wire brush and vacuum unless it has large oil
stains.





"Ben Gold" wrote in message
...
Thanks,

The asbestos has been removed already when we bought the place.



Before you go tearing down anything in the ceiling you might want to
make sure the heating pipes are not insulated with asbestos-based pipe
coverings. A place as old as yours is very likely to have them (my
1921 house does).

These things often deteriorate and flake off, especially at the
joints. You'd want to stabilize them first by painting them solidly
with exterior latex trim paint, or have them removed by an asbestos
abatement crew.