View Single Post
  #4   Report Post  
 
Posts: n/a
Default

I'm thinking that in my case I could pull the surround the weekend
before, and the toilet and vanity the night before. Then have the
installers replace the tub. Then go back and reinstall toilet and
vanity and I should be able to use my bathroom that night, correct?
Then at my leasure install a new surround or tile. Does that sound
feasable? It's the only bathroom in the house.