In article ,
"SawDust (Pat)" wrote:
Hi Ralph,
When I heard the statement. It was 20 days for design/drawings and
construction of the prototype. Then he suggested with the drawings
the construction would be about 10 days work. That's a lot more than
60 and 20 hrs.
You're right, I heard days and typed hours
--
--------------------------------------------------------
Personal e-mail is the n7bsn but at amsat.org
This posting address is a spam-trap and seldom read
RV and Camping FAQ can be found at
http://www.ralphandellen.us/rv