View Single Post
  #13   Report Post  
Ralph E Lindberg
 
Posts: n/a
Default

In article ,
"SawDust (Pat)" wrote:

Hi Ralph,

When I heard the statement. It was 20 days for design/drawings and
construction of the prototype. Then he suggested with the drawings
the construction would be about 10 days work. That's a lot more than
60 and 20 hrs.

You're right, I heard days and typed hours

--
--------------------------------------------------------
Personal e-mail is the n7bsn but at amsat.org
This posting address is a spam-trap and seldom read
RV and Camping FAQ can be found at
http://www.ralphandellen.us/rv