On Sun, 27 Mar 2005 12:53:17 -0500, "SawDust (Pat)"
wrote:
Hi Ralph,
When I heard the statement. It was 20 days for design/drawings and
construction of the prototype. Then he suggested with the drawings
the construction would be about 10 days work. That's a lot more than
60 and 20 hrs.
Maybe he didn't count the time spent waiting for glue and finish to
dry or cure.
|