View Single Post
  #11   Report Post  
George Max
 
Posts: n/a
Default

On Sun, 27 Mar 2005 12:53:17 -0500, "SawDust (Pat)"
wrote:

Hi Ralph,

When I heard the statement. It was 20 days for design/drawings and
construction of the prototype. Then he suggested with the drawings
the construction would be about 10 days work. That's a lot more than
60 and 20 hrs.


Maybe he didn't count the time spent waiting for glue and finish to
dry or cure.