View Single Post
  #2   Report Post  
Joseph Meehan
 
Posts: n/a
Default

stevef wrote:
I want to lay down some decorative brick/pavestone in my former
flowerbed.

How is best way to get solid foundation before putting down this
brick?


Usually that means digging out at least 4 inches + the thickness of the
paver of soil fill in 3½ inches with compacted crushed gravel and about an ½
inch of sand base.

--
Joseph Meehan

26 + 6 = 1 It's Irish Math