Alan wrote:
Yes, I've gone over 2 RCD's also between the split load CU RCD side,
and into the kitchen fed from it's on MRCD(?) on the non-CD side of
the CU. Works fine also.
Thanks for that, sounds like it'll be fine then. I'll hopefully be able to
give it a go over Easter.
Chris Key
|