"John Borman" wrote in message
...
"The Natural Philosopher" wrote in message
...
John Borman wrote:
So should I be worried that the guy that's installed central heating
into
a renovated house cut a U section in the top of the beam ,of 1st floor.
That depends.
If its then had e.g chipboard nailed on top, a lot of the strength and
stiffness is restored.
No chipboard just t&g floorboards....
The strength will be restored to a degree far better by using screws, not
nails.
|