Wait for your omnipresent winter rains to wash away the existing
driveway, and the demo is done at no charge....
Jim Beaver wrote:
What should I expect to pay for a driveway in Southern California --
a
standard, no-frills concrete slab, maybe 35 feet long and 20 wide,
with a
2.5 or 3' rise from to top level? Including demo of the old one?
Jim Beaver
|