"Roger Shoaf" wrote in message
...
Technically I think Duane is correct here. The preferred way would be to
have the circuit feed a sub-panel and have two circuits branch off from
there. Keep this in mind if you are going to have your electrical
inspected.
Yeah I agree and did not make the install modification permanent in the
event that I do ever move or have an inspection.
|