First of all do I need to, I presume so ?
If I need to as I suspect, whats the best practise? Is it acceptable/best to
cross bond the copper pipe back to the existing bonded pipework, or back to
an earth connection at the back of a socket ?
---
Outgoing mail is certified Virus Free.
Checked by AVG anti-virus system (
http://www.grisoft.com).
Version: 6.0.596 / Virus Database: 379 - Release Date: 26/02/2004