I'm buying a house in London that's been unoccupied for over a year.
I've been told by London Electricity that I'll need a Periodic
Inspection Report before they reconnect the power. This will cost over
=A3100... do all the electric companies require this as I'm thinking of
changing to Powergen in any case?


You`ll probably find it`s LEBs meter fixers who do the work regardless of=
=20
who the supplier is, so will probably still require one prior to=20
reconnection.

You could always try asking them to connect to an isolator switch only,=20
and as soon as they go, hit the switch !