Electrical Periodic Inspection Reports
Hi
I'm buying a house in London that's been unoccupied for over a year.
I've been told by London Electricity that I'll need a Periodic
Inspection Report before they reconnect the power. This will cost over
£100... do all the electric companies require this as I'm thinking of
changing to Powergen in any case?
Thanks
Jonty
|