In article ,
Andrew Gabriel wrote:
Years ago when doing this for some flats, the LEB insisted on MICC from
the fuses to meter/CU.
This would have been circa 1970.
LEB did a ~10m run of SWA in my brother's case. I was slightly
surprised they didn't install any type of switch/fuse.
My house also has SWA from the riser in the cellar to the meter at the top
of the stairs - and no switchfuse. It was also done sometime round about
'70 - before I bought the house.
But the LEB guy was adamant about the MICC - perhaps for fire reasons as
it ran through other flats in places.
--
*A picture may be worth a thousand words, but it uses up a thousand times more memory.
Dave Plowman
London SW
To e-mail, change noise into sound.