View Single Post
  #13   Report Post  
 
Posts: n/a
Default

(Kathy Wehrle) wrote:


Screws, cross bracing, gluing plywood to sides of floor joists,
doubling joists, and what would have really helped, your contractor
should have used construction adhesive on the top of the joists before
laying down the subflooring.

Pick your poison,

Wes

--
Reply to:
Whiskey Echo Sierra Sierra AT Gee Tee EYE EYE dot COM
Lycos address is a spam trap.