View Single Post
  #4   Report Post  
The Natural Philosopher
 
Posts: n/a
Default

mj wrote:

I'd give it a soaking with 4 water: 1 PVA and allow to dry before the
levelling.


Cheers Stuart ~ Will give it a go


I'll second that. PVA is essential before levelling to both toughen the
surface and stop rapid water absorption from levelling compound, which
buggers up its flow and setting characteristics.

I have also found that pouring huge quantities if thickish PVA down
screed cracks eventually binds them back together immovably.

Useful stuff, PVA.


I owe you one

ATB
Mike