View Single Post
  #3   Report Post  
Big Phil
 
Posts: n/a
Default


Ignore the 3 for the programmer, and ignore no.3 connection on the stat, and
then neutral to neutral, live to live and Load(heat) to RI (switched live)

Is this assuming that the Stat is wired in series with the programmer
though? Otherwise there is no time control to this system?

Phil