View Single Post
  #2   Report Post  
Christian McArdle
 
Posts: n/a
Default RCDs on outbuilding circuits

So what do you do about lighting circuits in an outbuilding???

Cheap option: put them on the RCD

Expensive option: have a 100mA time delay "whole shed" RCD. Lights go onto
this. Sockets go through this and an additional 30mA RCD (either split load
or RCBO). Not really necessary unless the shed is really a workshop with
dangerous power tools.

Christian.