RCDs on outbuilding circuits
So what do you do about lighting circuits in an outbuilding???
Cheap option: put them on the RCD
Expensive option: have a 100mA time delay "whole shed" RCD. Lights go onto
this. Sockets go through this and an additional 30mA RCD (either split load
or RCBO). Not really necessary unless the shed is really a workshop with
dangerous power tools.
Christian.
|