View Single Post
  #6   Report Post  
Suzie-Q
 
Posts: n/a
Default

In article ,
"Default User" wrote:

- I had a fairly standard tree-trimming job, removing dead limbs from a
- large silver maple and cleaning up some debris. So I get a couple of
- bids from local companies on doing the work, such things are usually
- within a fairly small range of each other.
-
- One gives me a bid for $450 (about what I'd expect).
-
- The other, bids $2500. What! Five times the other?
-
- I read the bid sheet, they had the correct job described, the right
- tree indicated, the correct address, all that. Needless to say, they
- didn't get work. I thought about calling and seeing what on earth they
- based that on, but in the end didn't bother.

I can answer that. It was based on the fact that a lot of people
aren't going to get more than one bid/estimate so they won't know
they're being screwed.
--
8^)~~~ Sue (remove the x to e-mail)
~~~~~~
"I reserve the absolute right to be smarter
today than I was yesterday." -Adlai Stevenson

http://www.suzanne-eckhardt.com/
***Revelation 22:12*** ICQ: 349878998