On Tue, 7 Sep 2004 09:15:25 -0700, "Bill"
wrote:
This is not rocket science. All you need to do is dig a ditch (good
exercise BTW) lay in a new larger pipe and connect it. Also may need a
building permit in some areas.
I would do it myself including digging the ditch with a shovel. I have done
this before, spent several weeks digging the ditch, but felt great after
all that exercise!
Personally, I had a laborer dig the trench, total cost of labor and
materials was right at $220. 1" PVC (We don't freeze, not sure if San
Jose would allow PVC...).
Jeff
|